Installation & Assembly
5
REV-12 10, 12
Faucet Installation
3. Connect the valve inlets (L) to inlet supply lines (M). Then connect the
supply stops (N) to the inlet supply lines (M) (left is hot water supply and
right is cold water supply). Make sure inlet supply lines (M) are securely
tighten. Do not overtighten.Turn on supply stops (N). Check for any
leaks. Make sure all the connections are secure.
4. Remove aerator (O). Open the handle. Flush and allow water to run at
fullowforatleastoneminute.Replaceaerator(O).