Installation & Assembly

4
REV-11 19, 12
Faucet Installation
4. The hot and cold side valves (H) are marked with ‘HOT’ and ‘COLD’ on
the valve. Place steel washer (J) and rubber washer (I) underneath of
the ‘HOT’ side valve. Slide the valve through mounting hole. Place rub-
ber washer (I) and steel washer (J) to the valve from underneath of the
mounting surface.
5. Ensure the handles are position correctly. Tighten the locknut (K) to the
valve (H) with the help of 1-11/32” socket. Install the ‘COLD’ side valve
same as ‘HOT’ side valve.
6. Connect the valve outlet hose connector (L) to the ‘Y’ connector (G).
7. Ensure all the connections are installed correctly.