Installation Guide
3
REV-01 17, 13
Trim Installation
Remove the temporary nipple.•
For Slip-Fit Installation (For 4LG100T,4BR1X0T, 4BR2X0T Only):- •
The 1/2” nominal copper tube must be cut with a minimum length of A •
to maximum length of B from nished wall.
The end of copper tube should be chamfered free of burrs to prevent •
cutting or nicking o-ring inside the tub spout. The outside surface may
be sanded free from nicks and scratches.
For tub spout with the tub spout escutcheon slide the spout escutch-•
eon along the copper pipe. Press and twist the spout over copper tube
ush with the spout escutcheon on the nished wall.
Tighten the set screw, do not over-tighten.•
For IPS Installation (For All Installation):-•
The 1/2” threaded pipe nipple must be kept with the minimum length of •
C to maximum length of D from nished wall.
Remove the octagonal nut (For 4LG100T, 4BR1X0T, 4BR2X0T) inside •
the spout by using nose plier.
For tub spout with tub spout escutcheon slide the spout escutcheon •
along threaded pipe nipple. Apply teon tape at the threaded connec-
tion. Screw tub spout onto the threaded pipe nipple ush with the spout
escutcheon on the nished wall and tighten by strap wrench.