Installation Guide

3
REV-01 17, 13
Trim Installation
Remove the temporary nipple.
For Slip-Fit Installation (For 4LG100T,4BR1X0T, 4BR2X0T Only):- •
The 1/2” nominal copper tube must be cut with a minimum length of A
to maximum length of B from nished wall.
The end of copper tube should be chamfered free of burrs to prevent
cutting or nicking o-ring inside the tub spout. The outside surface may
be sanded free from nicks and scratches.
For tub spout with the tub spout escutcheon slide the spout escutch-
eon along the copper pipe. Press and twist the spout over copper tube
ush with the spout escutcheon on the nished wall.
Tighten the set screw, do not over-tighten.
For IPS Installation (For All Installation):-•
The 1/2” threaded pipe nipple must be kept with the minimum length of
C to maximum length of D from nished wall.
Remove the octagonal nut (For 4LG100T, 4BR1X0T, 4BR2X0T) inside
the spout by using nose plier.
For tub spout with tub spout escutcheon slide the spout escutcheon
along threaded pipe nipple. Apply teon tape at the threaded connec-
tion. Screw tub spout onto the threaded pipe nipple ush with the spout
escutcheon on the nished wall and tighten by strap wrench.