Installation Guide
5
REV-11 19, 12
Valve Installation
7. Slide the rubber & steel washer (G,H) on the hot side valve from the top.
Thread locknut(F) from the top.
8. Place the valve from the mounting hole.
9.Adjustthelocknut(F)sothatthedistancebetweennishedsurfaceand
top of the valve is 1-3/4”.
10. Tighten rubber and steel washer (G,H) and locknut (F) from underneath
with the help of 1-7/16” socket or adjustable wrench. Install Cold side
valve as the same way.
11. Carefully install the hose (I) to the valve outlets. The other end connect it
to ‘T ‘ connector (E).
12. Do not over tighten the hose with adjustable wrench as it may damage
the valve assembly.