Instructions / Assembly
New Visions Glass Barn Door & Track Installation
9. Install Floor Glide
To locate the proper installation position in the oor, slide the
door into the desired closed position and mark the outside
edge of the door on the oor. Now place the door into the open
position and mark the inside edge of the door on the oor. Make
sure that whether the door is in the open or closed position that
the door NEVER leaves the Door guide. This is the proper
location for the Door guide. Make sure your guide location is
well marked.
With the door in the open
position, place the back piece
of the door guide onto the
marked location and then
place the front piece onto
that so it lines up. Insert
a screw into the right side
opening in the guide and
secure to the oor. Move the
door to the closed position
and insert the second screw
into the left opening in the
guide and secure to the oor.
See Figure 8.
Figure 8
1-1/4”
3/4”