Installation Instructions
XL1000Pro
Retrofit Instructions
13. Align the bottom of the Bias/Fil/Screen Assembly with the top of the breaker panel. Align rails up
with the rack marking the screw holes. Attach the rail sleeves to the rack where the markings are using the
hardware saved during disassembly. Make sure the rails are level from back to the front and from side to
side of the transmitter.
14. After the rail sleeves have been secured then slide the Bias/Fil/Screen Assembly into place
fastening the face plate to the front of the rack.
15. At the top of the of the Bias/Fil/Screen Assembly mark the hole just above the top panel. From
the Right side of the rack align brace with marked hold and fasten brace on from the side making sure it is
level. Repeat on Left side of transmitter.
16. Making sure the braces are secure slide the main power supply PS130-28 onto the braces. Fasten
Faceplate to the front of the rack.
17. From the front of the transmitter align the bottom of the Driver Box up with the main power
supply. Align rails up with the rack marking the screw holes. Attach the rail sleeves to the rack at the
markings are using the hardware saved during disassembly. Make sure the rails are level from back to the
front and from side to side of the transmitter.
18. Slide the driver box into the support rails previously mounted in the transmitter rack. Screw in the
faceplate to the front of the rack.
19. Screw the larger 4” faceplate provided, (Part Number MF9177) into the front of the transmitter
just above the driver box.
20. At the top of the faceplate mark the hole just above the top of the panel. From the right side of the
rack, align brace with marked hole and fasten brace from the side making sure it is level. Repeat on left
side of transmitter.
21. Making sure the braces are secure slide the MFA1KW onto the braces. Fasten faceplate to the
front of the rack.
22. From the front of the transmitter slide the filter into the space between the MFA1KW and the
original TTC metering panel. Screw in the face of the filter to the rack.
23. Insert the 3/4” smaller faceplate provided, (Part Number MF9178) into the space between the
original TTC metering panel and filter. Screw in the faceplate.
24. From the back of the transmitter insert one of the U600LD amplifiers into the back right side of
the MFA1KW making sure it is inserted correctly. Screw the U600LD into the back of the MFA1KW using
the six screws provided.
25. From the back of the transmitter insert the other U600LD amplifier into the back left side of the
MFA1KW making sure it is inserted correctly. Screw the U600LD into the back of the MFA1KW using the
six screws provided.
26. From the top of the transmitter, install the exhaust fan assembly (Part Number 1A0021) to the top
of the transmitter using the existing bolt patterns and the screws saved from disassembly. Secure the AC
cable on the outside of the rack supports and rails on the left side of the transmitter using tywraps as
necessary to ensur the AC cord will fit between the rack supports and the outer cover. Secure AC cord to
the bottom of the rack with tywraps making sure there is enough cord to plug in to the junction box. Plug
AC cord into junction box 110VAC socket.