Datasheet

PNOZmulti 2 products
Link modules
PNOZ m EF PDP Link
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: info@pilz.com
2015-11
806
The online help on the PNOZmulti Configurator contains descriptions of the operating
modes and all the functions of the control system, plus connection examples.
Data exchange:
} Communication with the decentralised modules is via a safe data link.
} The link module PNOZ m EF PDP Link reads the input information from the decentral-
ised modules as part of each cycle and then forwards it to the base unit.
} At the end of a PNOZmulti cycle, the base unit sends its output data to its link module.
This output data is immediately sent to the decentralised modules.
Linking several decentralised modules:
} A maximum of 4 link modules can be connected to a base unit PNOZmulti 2.
} A maximum of 4 decentralised modules can be connected to a link module PNOZ m EF
PDP Link.
} If a decentralised module receives data intended for a different decentralised module
that is connected, the data is forwarded without being processed.
System reaction time
Calculation of the maximum reaction time between an input switching off and a linked out-
put in the system switching off is described in the document "PNOZmulti System
Expansion [
29]".
Block diagram
24V 24V
=
Power
=
0V 0V
Interface
to previous
module
Interface
to next
module
CAN+ CAN-
VCC GND
FE