Datasheet

PNOZmulti Mini products
Base units
PNOZ mm0.2p
Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: info@pilz.com
2015-11
551
When connecting two base units via the integrated interface please note:
} The max. cable length between two base units on a connection with
one link module PNOZ ml1p <V2.0: 100 m
one link module PNOZ ml1p from V2.0, PNOZ mml1p or one base unit PNOZ
mm0.2p: 1000 m
} Connect the inputs and outputs via the two interfaces using 4-core shielded cable. The
cables must be twisted in pairs (see "Preparing for operation").
} Note the crossover cabling, e.g. CA+ with CB+.
} The cables must be classified into a minimum of Category 5 in accordance with ISO/
IEC 11801.
Preparing for operation
Function test during commissioning
Using the chip card
Make sure that you do not bend the chip card as you insert it into the chip card slot.
Commissioning the PNOZmulti safety system
Procedure:
} Wire the inputs and outputs on the base unit in accordance with the circuit diagram.
} Connect the supply voltage:
Supply voltage for the control system:
Terminal A1: + 24VDC
Terminal A2: 0 V
Supply voltage for the semiconductor outputs:
24 V terminal: + 24VDC
0V terminal: 0 V