Insulation monitor
PMD s20
1001753-EN-02-2011-05
Only one insulation monitor should
be connected to galvanically con-
nected systems.
A function test involving a real earth
fault (resistance) must be carried
out in order to check that the unit is
properly connected.
Information given in the “Technical
details” must be followed.
Preparing for operation
Inbetriebnahme_Anschluss
Supply voltage UB:
– Connect the supply voltage UB
to A1/A2. The supply voltage UB
can also be taken from the
measuring circuit.
Measuring circuit (system to be
monitored):
– 2-phase system:
– Connect one phase of the moni-
tored system to the terminals
B1/B2 respectively.
– 3-phase system:
– Link terminals B1/B2 and con-
nect them to the system's star
point.
Connect the output contacts in ac-
cordance with the relevant applica-
tion circuit.
Function test:
– By pressing a button at terminals
Y1 and Y3
or
– Pressing the rotary knob for at
least 3 seconds
Leerzeilen
Inbetriebnahme
Please note:
Do not connect any cables to undesig-
nated terminals.
Application circuit AC
Inbetriebnahme_Anwendung_Bild_1
L1
N
PE
1L1
1L2
E1
R
e
R
e
F1
F2
T1
Test
Y3
Reset
12
14
11
A1
A2
24
22
21
Y1
Y2
B1
B2
FE
PMD s20