Operation Manual
Ensure that the installation of your product conforms to all the indications given below.
1.0 GENERAL RULES
We recommend that the ue must have a chamber for collecting solid matter and any condensate located below the connection and which may be
easily inspected by means of an airtight door. (Fig. 1)
DT2010031-01
1.1 SOOT INSPECTION
SOOT INSPECTION APERTURE
CHIMNEY STACK
CHIMNEY
CONNECTION
TO FLUE
MINIMUM SAFETY
DISTANCES
CAPACITY LOAD
OF THE FLOOR
FRESH AIR INTAKE
FLUEWAY
ELECTRIC
POWER SUPPLY
Fig. 1
H07032120 / DT2002308 – 00
4
English
DT2010216-05
DT2030321-01