Technical data
TRIO-PS/1AC/24DC/5
102777_02_en PHOENIX CONTACT 9
BA
A
B
Assembly
Position the module with the DIN rail guide on the upper edge
of the DIN rail, and snap it in with a downward motion.
Removing
Pull the snap lever open with the aid of a screwdriver and
slide the module out at the lower edge of the DIN rail.
TN-S TN-C
TT iT
L
N
PE
+
LN
-
PE
L
PEN
+
LN
-
PE
+
LN
-
PE
L
N
+-
L
N
PE
L1
L2
L3
Connection to various network forms
The connection for 100 V AC ... 240 V AC is made using the
L, N and PE screw connections.
The device can be connected to 1-phase AC networks or to
two of the phase conductors of 3-phase networks (TN, TT or
IT networks in acc. with VDE 0100-300/IEC 60364-3) with
nominal voltages of 100 V AC ... 240 V AC.
In the case of input voltages > 300 V AC, the device switches
off for its own safety. After the overvoltage has ceased, the
device starts automatically within a few seconds.
For operation on two of the phase conductors of a three-
phase system, an isolating facility for all poles must be pro-
vided.
In order to comply with the UL certification, use
copper cables that are designed for operating
temperatures of > 75°C.
In order to comply with EN 60950/UL 60950,
flexible cables require ferrules. To safely con-
nect a device, the ferrules should have a
length of at least 10 mm. To achieve a reliable
and shockproof connection, strip the connect-
ing ends according to section "Structure".










