
Step 5 – run harnesses for Automatic Tire Inflation System, with approximately 2” of jacket fed through
Smart 7 grommet.
Step 6 – connect ATIS wiring and LampCheck ATIS as shown in Figure 2
Figure 2
Note – LampCheck ATIS ground wire will be pre-installed on ground post.