Specifications
IV. Assembly Procedures
Assembly should take you no more than a few hours. Follow the instructions below
very carefully, taking special note of the Helpful Hints , Notes and
Warnings . This will help prevent breakage of any difficult-to-replace
components. The Appendix, located at the end of this document, identifies the
fixtures and assemblies you will be installing.
Again, should any technical issues arise during assembly or operation
of this unit, please contact your RK2 Systems Distributor.
Mounting the Top/Cone Assembly
1. Separate the gaskets and parts as shown in Fig. 1.
2. Apply grease to seal in a complete circle inside of the circle of bolt holes as
shown in Fig. 2.
HELPFUL HINTS: Do not get this grease on your clothes! It cannot
dry, which is one of the reasons it’s perfect for this job. As long as
you’ve got the grease on your finger, you can also apply it to the
rubber grommets as shown in Figs 9a and 9b, the Waste port in Fig.
10, and the intake port as shown in Fig. 24. However, if you do that
you’ll be skipping around so be sure to return back to Step 3, below,
after you’re finished greasing!
Fig. 1 Fig. 2










