Specifications

Congratulations! You have successfully assembled the RK 150 PE! Now it’s time
to plumb the RK 150 PE to the outside world.
36. Plumb the dirty water to the 2” Ball Valve Intake.
37. Plumb the Waste Drain to the sewage line.
38. Plum the 4” Discharge to reservoir.
WARNING: Immediately after the 4” Discharge, you must provide a
minimum of 12” vertical drop. Do not install horizontal piping until
you have provided 12” of vertical drop.
39. After you have completely connected the RK 150 PE, fire it up! Then inspect
for any unions or nuts/bolts that leak, and hand tighten.