Specifications

29. Attach the Clear Sight Gauge to the pipe click and the 3/4” as shown in
Fig. 29.
Fig. 29
30. Take the 2” Discharge Air Vent and cover the threading with Teflon tape, as
shown in Fig. 30.
Fig. 30