Specifications
Mounting the Pump
18. Position the Pump Base over the holes on the 150 PE Platform.
(See Fig. 18)
19. Place the Pump on top of the Pump Base. (See Fig. 19)
Fig. 18 Fig. 19
20. Using the 1/4” x 1” bolts and 1/4” x 5/8” washers provided, attach the Pump
and Pump Base to the 150 PE Platform, as shown in Fig. 20.










