controller will adopt PWM voltage limiting charge mode. It dumps the excess energy. When wind turbine charging
current exceeds pre-set brake current point, the controller will automatically start brake to protect battery banks.
LCD Display Function:
LCD Display Function: LCD Display Function:
LCD Display Function: LCD screen can display system status and parameters via visual digital and graphic form. Such as:
battery voltage, wind turbine voltage, PV voltage, wind turbine current, PV current, wind turbine power, PV power,
battery power status etc.
Perfect Protection
Perfect Protection Perfect Protection
Perfect Protection Functions
FunctionsFunctions
Functions:
::
: Battery over charge protection, Battery over discharge protection, Battery anti-reserve
connection protection, wind turbine current-limiting charge, automatic brake, manual brake; solar anti-reverse charge
protection, solar anti-reverse connection protection, lightning protection, etc.
2. Installation Instruction
Installation InstructionInstallation Instruction
Installation Instruction
Step 1.
Step 1.Step 1.
Step 1. Check the package and then check the controller for damage after unpacking. Damaged controller cannot be
installed in the system.
Step 2.
Step 2.Step 2.
Step 2. For controller whose dump load box is separated, please connect dump load box to the “DUMP LOAD” terminals of
the controller.
Step 3.
Step 3.Step 3.
Step 3. Connect battery positive pole to the positive (+) “BATTERYterminal, Connect battery negative pole to the negative
(-) “BATTERY” terminal with copper core cable.
(Note: Although the controller has anti
Note: Although the controller has antiNote: Although the controller has anti
Note: Although the controller has anti-
--
-reverse connection protection function, wrong polarity of battery shall be forbidden!
reverse connection protection function, wrong polarity of battery shall be forbidden!reverse connection protection function, wrong polarity of battery shall be forbidden!
reverse connection protection function, wrong polarity of battery shall be forbidden!
Please refer to Appendix I for copper wire over current capability
Please refer to Appendix I for copper wire over current capabilityPlease refer to Appendix I for copper wire over current capability
Please refer to Appendix I for copper wire over current capability.)
Step 4.
Step 4.Step 4.
Step 4. Connect the wind turbine output lines to the “WIND INPUT” terminals in condition of wind turbine in action-less or
low speed.
Step 5.
Step 5.Step 5.
Step 5. Connect solar panels to the “SOLAR INPUT” terminals.
Step 6.
Step 6.Step 6.
Step 6. Check all connection is proper and firm or not.
Step 7.
Step 7.Step 7.
Step 7. If the controller has communication function, user can read and set relevant parameters via software.
Step 8.
Step 8.Step 8.
Step 8. User can set relevant parameters through LCD buttons.