Installation Guide

2
Prepare Rough-In & Set Up Stem Rotation


2
2B
Thin Surface Installation (1
3
8" Max)
(35 mm)
(35 mm)
Stem Rotation Set Up


Spout Gap Dimensions


Thick Surface Installation
(1
3
8" – 2
3
4" Max)
(41 mm – 70 mm)
(41 mm – 70 mm)
Hot
Caliente
Chaud
Cold
Fría
Froid
Hot
Caliente
Chaud
Cold
Fría
Froid
Option 1 • Opción 1 • Option 1
Option 2 • Opción 2 • Option 2

3
8

Si el grosor de la plataforma excede 1 3/8 pulg. (35 mm), se debe utilizar un
juego de extensión del vástago 974375 de Pister™.
Si l’épaisseur du plateau de montage dépasse 1 3/8 po. (35 mm), il est
nécessaire d’utiliser un kit de prolongement de tiges Pister™ 974375.


El tope de la espiga puede ser insertado en la espiga en dos posiciones,
dependiendo de la rotación que se quiera tener en los puños.
L’Arrêt De La Tige peut être introduit dans la tige de deux façons, selon la
rotation que l’on veut obtenir pour les leviers.
2A

Tope del vástago
Arrêt de la tige

Tope del vástago
Arrêt de la tige

Vástago
Tige

Vástago
Tige

8" (41 mm)

3
"
(70 mm)
Max

3
8" (35 mm)

"
(139 mm)
8
3
"
(222 mm)