Installation Guide
ENGLISH
ENGLISH
3
4
5
2
FAUCET INSTALLATION
Thank you for purchasing this Pster product. All Pster products are carefully engineered, and factory tested to provide long
trouble-free use under normal conditions. This product is easy to install using basic tools and our easy to follow illustrated
instructions. If you have any questions regarding this product, call 1-800-Pfaucet (1-800-732-8238).
1 BEFORE PROCEEDING
WARNING: Read all the instructions completely before proceeding. Pster
recommends calling a professional if you are uncertain about installing this product!
This product should be installed in accordance with all local and state plumbing and
building codes.
2 SHUT OFF WATER SUPPLY
Locate water supply inlets and shut off the water supply valves. These are usually found
under the sink or near the water meter. If you are replacing an existing faucet, remove
the old faucet from the sink and clean the sink surface thoroughly.
3 TOOLS RECOMMENDED
• PTFE Plumber's Tape • Plumber's putty • Slotted screwdriver
• Adjustable wrench • Pliers • Flashlight
• Cloth
Your installation may require new supply lines and / or shut-off valves or other additional
tools.
4 SECURING UNIT BODY
3
/
16
” Dia. Screw Holes (4B) are provided to secure Unit Body (4A) to framing (4C) or
other solid support.
CAUTION: Be sure to position Base Body (4A) correctly in wall, with Base Body
Inlets (4D) facing down.
5 UNIT BODY POSITION
Recommended all holes on nished wall be 1
1
/
4
” (32 mm) diameter. The center distance
between holes is 4” (102 mm).
Depth (5B) for Unit Body (5A) in wall is measured from End of Base Body (5C) to
nished wall surface (5D). Minimum distance (5B) is 3
9
/
16
” (90 mm) and maximum
is 4
3
/
16
” (106 mm).
4
3
/
16
” (106mm)
2
4A
4C
4D
4D
4B
4B
5B
5C
5D
5A
1
1
/
4
” (32 mm) dia.
3X
3
9
/
16
” (90mm)
4” (102 mm) 2X
FINISHED WALL