Installation Guide

ENGLISH
ENGLISH
11
12
14
15
11 TEST PLUG REASSEMBLY
Once all pipe joints are soldered, reassemble the Test Plug (11A) and Backup Plate
(11B) into Valve Body (11C). Secure tightly using Screws (11D).
12 PRESSURE TESTING
Use two
1
/
2
” iron pipe plugs (12A) (not included) on both Shower Outlet (12B) and Tub
Outlet (12C). Perform pressure test. Look for leaks from the outlets.
WARNING: Pressure testing is not to exceed 250 PSI. Make sure pressure is
balanced between hot and cold inlets.
WARNING: Differential pressure of hot and cold inlets must not exceed 100 PSI.
CAUTION: Slowly remove pipe plugs (12A) from tub and shower outlets to
relieve pressure.
Proceed to valve cartridge installation.
13 UNIT START UP
Turn on water supplies, and check all connections for leaks.
14 MODEL WITH INTEGRAL VALVE STOPS
Integral Stops (14A) provide an alternate means to shut off the water supply. With a at
head screwdriver (14B), the entire water supply can be shut off by rotating the valve stem
(14C) clockwise. The integral stops can be used for temporary shutting off the water supply
to allow access to the cartridge assembly for maintenance.
15 PLASTERGUARD REPLACEMENT
Replace plasterguard (15A) into Valve Body and secure with Screws (15B).
Proceed to nish wall.