Installation Guide

ENGLISH
ENGLISH
14
11
12
13
11 HOSE CONNECTION TO VALVE BODY
Slide the End Connectors (11A) with arrow (11D) pointing up onto the Valve Bodies (11B).
Push the End Connectors (11A) all the way up until completely seated. Be careful not
to damage O-Rings (11C).
Reverse steps to remove Hose Connection.
12 SIDE SPRAY HOSE CONNECTION
From underneath sink, push Spray Hose Fitting (12A) into Center Connector (12B) until
unable to push any further. Pull on connection Fittings (12A). If the Fittings (12A) and
the Inner Collet (12C) separate slightly but do not pull off, the connections are secure.
To remove Side Spray Hose (12D), push up on Hose Fitting (12A), holding Plastic
Collet (12C) in place, pull downward on Hose Fitting (12A) until Center Connector
(12B) is free.
13 WATER SUPPLY CONNECTIONS
First, thread Inlet Connectors (13A) into Water Supply Lines (13B). Then, insert Inlet
Connectors (13A) into Valve Bodies (13C). Hot water supply lines go into left inlet.
Cold water supply lines go into right inlet. (Supply lines not included). Please follow
manufacturer’s instructions when installing supply lines. Next, insert Clips (13D) into
Valve Body Holes (13E), to secure unit.
WARNING: Do not twist Inlet Connectors (13A) once installed!
14 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
4
HOT
COLD
13A
13C
13A
13B
13C
13B
13B
13D
13D
13E
13D
11A
11A
11A
11D
11D
11C
11B
11C
11B
12A
12B
12D
12D
12B
12C
12C
12A
12B
12B
12A