Operation Manual
Lay
the
thread
from
back
to
front
over
the
right-hand
side
of
the
looper.
Carefully
pull
the
thread
to
the
left
and
slightly
down
until
it
slips
into
notch
B
(=
threading
point
10)
of
the
looper.
Insert
the
thread
from
the
front
through
the
eye
of
lower
overedge
looper
C
(=
threading
point
11).
The
thread
must
run
along
the
groove
in
the
looper.
Pull
about
four
inches
(10cm)
of
thread
through
the
looper
and
lay
it
to
the
left
un
derneath
the
presser
foot.
Insert
the
thread
along
the
path
marked
in
yellow
through
thread
guides
5
to
8.
Place
the
thread,
using
the
tip
of
the
twee
zers,
into
thread
guide
(9).
B---A
C
15