operators_manual

Table Of Contents
New Vehicle Maintenance
Schedule
First Day
First Day
Perform a total vehicle alignment once a body is installed on the truck chassis.
Steering U-joint Pinch Bolt
Refer to Steering Shaft Bolt Torque Specifications on page 290 for maintenance instructions.
Front Suspension - U-bolts
Check the general condition and the tightness of the nuts. Tighten the U-bolts using a calibrated torque wrench to the specified
torque value. (Refer to Suspension U-Bolts, Grade 8 on page 306 for maintenance instructions.)
Front Suspension - SOFTEK
®
NXT (Hendrickson) - Shock Absorbers
Inspect for leaking, body damage, and damaged or worn bushings. Replace as required. Check the shock mounting stud
torque. (Refer to Front Axle and Suspension on page 273 for maintenance instructions.)
Front Suspension - SOFTEK
®
NXT (Hendrickson) - Spring Pins and Shackles
Inspect for worn parts and excessive joint clearance. Shim or replace as required. (Refer to Front Axle and Suspension on page
273 for maintenance instructions.)
Front Suspension - SOFTEK
®
NXT (Hendrickson) - Ride Height
Inspect that ride height is within specifications. (Refer to Air Suspension Ride Height for maintenance instructions)
Front Axle - SOFTEK
®
NXT (Hendrickson) - Axle Clamp Through Bolts
Check the tightness of the through bolts at the bolt head. Tighten the fasteners using a calibrated torque wrench to the specified
torque value. (Refer to the Hendrickson operator’s manual for torque specifications.)
MAINTENANCE - New Vehicle Maintenance Schedule
Y53-6126-1A1 (01/21) 191
5