Installation Guide
5
ASSEMBLY INSTRUCTIONS
DD
5. Working toward the right, slide another set of
horizontal rails (D) into the intermediate post (C)
and then a corner post (B) to the right.
NOTE: Adjust your use of corner posts (B) and
intermediate posts (C) depending on which
configuration you are building, following the
exploded view shown earlier.
7. Insert top and bottom horizontal rails (D) into the
corner posts to start the side of kennel, then into
an intermediate post (C). Then, another set of
horizontal rails (D) and then a corner post (B).
This will complete the right side of the kennel frame.
Note: If you are building in the 5 ft. x 15 ft.
configuration, repeat the process with two more
horizontal rails and another intermediate post.
Repeat this process to complete the left side of
the kennel.
7
D
D
D
D
D
D
D
B
D
C
C
C
C
B
5
B
D
6.
Tighten the screws on all corner (B&H), gate (F) and
intermediate posts (C). It is important to leave 2 inches
space between the swinging side of gate and the post
for proper latch function. This will complete the gate
side. Carefully stand the completed panel up.
6
E
F
C
H
2 in.
H
E