Specification Sheet
9
www.rohlhome.com
Installation Instructions
Consult your local ROHL showroom for additional information and specications. For complete warranty details and a list of showrooms, go to www.rohlhome.com.
4
www.rohlhome.com
U.6388 Installation Guide Page 2
Consult your local ROHL showroom for additional information and specifications. For complete warranty details and a list of showrooms, go to www.rohlhome.com.
Install stop valve onto NPT
connector with slotted screw
facing the rear of the installation,
fully tighten bottom nut. Check
that slotted screw has remained in
position.
The rough line should be tested
by using the in-line isolating valve.
It is recommended to fit a 3/4”
plug to leak test the Supply Flex
and joint.
Fit a 3/4” plug to leak test the
installations
Floor hole size max
diameter 1”, the rough
line must be fully
supported
1/2” connection










