Installation Instructions
PERLICK RESIDENTIAL RS-CDK INSTALLATION INSTRUCTIONS
perlick customer service (800)558-5592 | 9
INSTALLATION
Insert end of the snorkel up into the tower and screw air
scoopmounngbracketintovacatedholesabovethefan.
6.
InstalltheAirScoopKit.Startbyremovingtheuppersetof
screwslocatedabovethefanonthebackwallofthecabinet.
Assemblecomponentsfromthekitasfollows–Insertblack
snap bushing into air scoop mounng bracket, then insert
oneend oftheair snorkelthroughthesnapbushing.Azip
ecanbeinsertedbehindthemounngbrackettokeepthe
tubeinplace.
NOTE: For Adara Towers, the air snorkel consists of a 3 inch
piece of black tubing and a 3 inch piece of clear tubing that
slides over each other and then is clamped using included
worm drive clamp. The black tube is inserted per the above
instrucons and secured with the included zip e. The clear
tube is installed over the air “T” from the dispensing head and
secured with the included worm drive clamp. See Figure 4 on
page 5 for illustraon.
4.
5.