Installation Instructions

PERLICK RESIDENTIAL RS-CDK INSTALLATION INSTRUCTIONS
perlick customer service (800)558-5592 | 9
INSTALLATION
Insert end of the snorkel up into the tower and screw air
scoopmounngbracketintovacatedholesabovethefan.
6.
InstalltheAirScoopKit.Startbyremovingtheuppersetof
screwslocatedabovethefanonthebackwallofthecabinet.
Assemblecomponentsfromthekitasfollows–Insertblack
snap bushing into air scoop mounng bracket, then insert
oneend oftheair snorkelthroughthesnapbushing.Azip
ecanbeinsertedbehindthemounngbrackettokeepthe
tubeinplace.
NOTE: For Adara Towers, the air snorkel consists of a 3 inch
piece of black tubing and a 3 inch piece of clear tubing that
slides over each other and then is clamped using included
worm drive clamp. The black tube is inserted per the above
instrucons and secured with the included zip e. The clear
tube is installed over the air “Tfrom the dispensing head and
secured with the included worm drive clamp. See Figure 4 on
page 5 for illustraon.
4.
5.