Installation Instructions
PERLICK RESIDENTIAL UNDERCOUNTER INSTALLATION MANUAL
6 | perlick.com/residential
PREPARING THE SPACE
CAUTION
If the unit is to be installed under 
a countertop, it is recommended 
that the countertop be supported by surrounding 
cabinetry and use shims to support countertop 
directly above the refrigerated cabinet. 
CAUTION
Make sure the oor under the 
unit is level with the surrounding 
nished oor. Protect a nished oor with plywood, 
cardboard, or some other suitable material before 
moving the unit into place. Failure to do this may result 
in damage to the oor.
PLACING THE CABINET
To assure maximum performance, fresh air must 
be allowed to circulate through the machinery 
compartment. Do not place anything in front of the 
cabinet that would obstruct air ow at these grilles. Do 
not place the unit in an unventilated small room.
N OTICE
Cabinet should be leveled front to 
back then side to side
1). Make sure the space opening is correctly sized for 
the unit. See chart below for nished rough opening 
requirements:
HP15 15” Signature Series
Height Depth Width
34-3/8” minimum,
35-1/2” maximum
24” 15”
HP24 24” Signature Series
Height Depth Width
34-3/8” minimum,
35-1/2” maximum
24” 24”
HH24 Signature Shallow Depth
Height Depth Width
32-1/2” 18” 24”
HC24 24” C-Series
Height Depth Width
34-3/8” minimum,
35-1/2” maximum
24” 24”
HA24 24” ADA-Compliant Series
Height Depth Width
32-1/2” 24” 24”
NOTE: For a cabinet door to open properly, the door must open a 
minimum of 90°. Use a minimum 3” ller in corner installations to 
assure a full 90° opening. Allow 25” clearance in front of unit for full 
door swing and shelf/drawer pull out for all units.
2). Check that the following are level and square:
•  Front and interior opening
•  Installation opening and oor surface
•  Countertop bottom front edge
NOTE: The oor under the unit must be at the same level as the 
surrounding nished oor.
CAUTION
To prevent possible damage to 
the countertop, do not place 
heavy objects on countertop directly over unit.
INSTALLING THE UNIT
1) Plug the unit into the 15 amp grounded electrical 
outlet located within the installation opening. With 
power applied to the unit, check that the lighting and 
cooling functions operate properly. Turn o the power 
to the wall outlet at the circuit breaker.
2) With all surfaces in the installation opening square 
and level, refer to Figure 4 on page 7 and perform the 
following steps to level the unit:
•  At the front of the opening, measure from the oor to 
the bottom of the front edge of the countertop.
•  Measure from the oor surface to the top of the unit 
at the rear corners.
•  Adjust the unit legs so these two measurements are 
equal. Using an adjustable wrench or pliers, turn legs 
clockwise to lower the unit or counterclockwise to raise it. 
NOTE: Legs should not extend more than 3/4” from the bottom 
of the unit. 
3) Slide the unit into position in the opening. Make sure 
the rear leveling legs slide under the ant-tip brackets. 
Push the unit into the opening until the bottom front 
edge of the unit is ush with the surrounding cabinetry, 
or until the rear legs are tight against the anti-tip 
brackets.
4) Shim the front of the unit so the front face is ush 
with the surrounding cabinetry. Adjust the front legs to 
support the countertop at the shimmed height. Using 
an adjustable wrench or pliers, turn the legs clockwise to 
lower the unit or counterclockwise to raise it. Countertop 
should be resting on top of the unit.
NOTE: Countertop should be resting evenly on entire top of the 
unit. Shim if necessary to prevent damage to the countertop.










