Installation and Operations Instructions
18” SHALLOW DEPTH SERIES
Operation / Installation Manual
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specications without prior notice 
7
18” SHALLOW DEPTH SERIES
Operation / Installation Manual
INSTALLATION
CAUTION
Finished  flooring  should  be  protected  with 
appropriate  material  to  avoid  damage  from 
moving the unit.
If unit is built into cabinetry, allow clearance for 
unit to be removed from opening for potential 
future service requirements.
If unit has been laid on its back or sides, place 
unit  upright  and  allow  minimum  of  24  hours 
before connecting power.
WARNING
Shut  off  power  to  the  wall  outlet  before 
installing unit into the opening.
IMPORTANT:  
IMPORTANT:        
IMPORTANT: 
IMPORTANT: 
CAUTION
To  prevent  damage  to  the  countertop  and 
unit  underneath,  do  not  place  heavy  objects 
on  countertop  directly  above  the  unit. 










