User Guide

© 2009
7
24” ADA-Compliant Series Operation / Installation Manual
Figure 8. Solid Wood Overlay Door Panel
WOOD OVERLAY INSTALLATION
Before beginning installation, check all components for prop-
er fit and finish.
WARNING
All overlay doors require a trim panel at least 3/4” thick.
The solid wood overlay panel should not weigh more
than 20 pounds.
The glass wood overlay panel should not weigh more
than 10 pounds.
The following instructions cover installing a solid wood over-
lay or glass wood overlay panel, handle and optional lock.
IMPORTANT: Contact the factory for full size wood overlay
panel layouts.
Refer to Figure 7 for glass wood overlay door panel.
Refer to Figure 8 for solid wood overlay door panel.
Door Lock Installation (optional)
When installing to wood overlay, perform lock installation
before mounting wood overlay to door.
1. See Figure 6. Attach mounting bracket to wood overlay.
2. Insert lock body and attach with nut.
3. Install lock strike, lock washer and screw.
4. Use the key to turn the lock and verify that the lock and
unlock positions are correct: unlock should be up, lock
should be horizontal. Adjust as necessary.
5. Install overlay with lock assembly to the door.
6. Install lock bracket to the unit.
Handle Installation
CAUTION
Handle mounting on wood overlay door should be mounted
on overlay panel only (not the door) to avoid damage to the
factory door.
1. Handle must be attached to overlay before mounting
overlay onto door. Mark rear of wood overlay panel with
handle fastening locations.
2. Drill through wood overlay panel at marked locations tak-
ing care not to damage the wood overlay panel.