Disassembly and assembly

Installation Procedure
Illustration 347 g02553437
Typical example
Illustration 348 g02553697
1. Ensure that all components of the pulleys and
guide rollers are clean and free from wear and
damage. If necessary, replace any components
that are worn or damaged.
2. Ensure that the pulleys and guide rollers are free
from dirt and build up from the old belt.
3. Position new alternator belt (6). Ensure that the
alternator belt is centered on all pulleys.
Note: The ribs on the alternator belt must be located
into the grooves of all pulleys.
4. Tighten bolt (1) until adjusting bracket (5) has
reached the full extent of the available adjustment
in Position (A).
5. Tighten bolt (3) to a torque of 50 N·m (37 lb ft).
6. Tighten nut and bolt (4) to a torque of 50 N·m
(37 lb ft)
7. Rotate tensioning bolt (1) two complete revolutions
in a counterclockwise direction. Tighten locking
nut (2) to a torque of 30 N·m (266 lb in).
8. If the engine has guards, install the guards. Refer
to the OEM for the correct procedure.
i05284614
Idler Pulley - Remove and
Install
Removal Procedure
Start By:
a. Remove the alternator belt. Refer to
Disassembly and Assembly, “Alternator Belt -
Remove” for the correct procedure.
NOTICE
Keep all parts clean from contaminants.
Contaminants may cause rapid wear and shortened
component life.
192 UENR0624-03
Disassembly and Assembly Section
This document has been printed from SPI2. NOT FOR RESALE