Installation Manual

Electrical & Electronic Application And Installation Manual
Production Release Version 1.0
Page 94
DEF System Configuration
Application Sections
Perkins Supplied PETU 8.2.2.1
8.2.2.2
8.2.2.3 or 8.2.2.4
8.2.2.5
Perkins PETU with Remote PEU 8.2.2.1
8.2.2.2
8.2.2.3 or 8.2.2.4
8.2.2.5
Perkins Header with PEU 8.2.2.1
8.2.2.2
8.2.2.3 or 8.2.2.4
8.2.2.5
8.2.2.6
Table 8.3 Applicable A&I
8.2.2 PETU Electrical Connections & Component Installation
Requirements
For correct operation of the DEF system the customer must connect the
following;
- Power supply (4-way connector)
- Communication and control connections (12-way connector)
- Pressurised DEF line heater connection (2-way connector)
- DEF Header feed and return lines (remote Pump Electronic Unit only)
- DEF Fluid Injector
The heated line connections are provided as part of the line assembly and so
do not require any specific customer wiring during installation. The PETU
power supply and communication connections however must be wired as part
of the customers machine harness for these components. Electrical
connection requirements are shown in figure 8.5.
PETU Communication
Connector – AMP 776437-1
Sockets – Deutsch 0462-201-1631
Connector Seal – AMP 2098582-1
Connector – Deutsch DTP06-4S-E003
Engine ECM J1 Customer
Connector
DEF Injector
Connector – Bosch 1-928-403-874
Sockets – Bosch 1-928-498-056
Fused Unswitched Batt
Supply
Sockets – Deutsch 0462-210-1231
Wedge Lock – Deutsch WP-4S
PETU Power Connection
Connector – Deutsch DRCP28-86SA
Sockets 18-16AWG – Deutsch 1062-20-0377
Sockets 12-14AWG – Deutsch 1062-12-0166
Figure 8.5 1206F PETU Electrical Connections