Installation Manual
Electrical & Electronic Application And Installation Manual
Production Release Version 1.0
Page 133
Idle Validation Switch Test Circuit
2K
Normal
supply
voltage of
device
(Hall Effect
Devices only)
13V DC
V2
Device
Under
Test
IVS
IVS
V+
IVS
ground
11.1.4.1 Test Procedure
Test 1: Output at Min position
Place the Device Under Test (DUT) in its minimum or “released” condition.
Measure the voltage V1.
Test 2: Output at Min position: forced
Without causing damage, pull the pedal/ handle hard against the minimum
travel end stop. Measure the voltage V1.
Test 3: Output at Max position
Place the DUT in its maximum or “fully depressed” condition.
Measure the voltage V1.
Test 4: Output at Max position: forced
Without causing damage push the pedal/ handle hard against the maximum
travel end stop. Measure the voltage V1.
Test 5: IVS switch Closed Voltage
Place the DUT in its minimum or “released” condition.
Measure the voltage V2.
Test 6: IVS switch Opening Threshold
Place the DUT in its minimum or “released” condition.
Test 7: IVS switch Open Voltage
Place the DUT in its maximum or “fully depressed” condition.
Measure the voltage V2.
Test 8: IVS switch Closing Threshold
Place the DUT in its minimum or “released” condition.
Test 9: track resistance (potentiometer type sensors only)