Installation Sheet

0212ES | 03/2021 | PAGE 11 OF 13
PERGO® IS MANUFACTURED AND DISTRIBUTED BY UNILIN NORTH AMERICA, LLC
CUSTOMER SERVICE | 1-800-33-PERGO | NA.PERGO.COM/CONTACT-US
Pergo Xtra Installation Instructions
13. Repeat this process for each plank working your way up to the last row. (Figure 8)
14. For the last row of the installation, use painters tape to mark the stud location for brad nailing. Cut all planks in the last row to
the required width to complete the installation. Complete the installation as you have the earlier rows.(Figure 8a)
15. Use quarter round for inside corners and ceiling. Finish with wall base board of your choice. (Figure 9)
PERGO Timbercraft + WetProtect Horizontal Accent Wall Install Instructions
11
2020_0425_TIM_INST
13. Repeat this process for each plank working your way up to the last row. (Figure 8)
14. For the last row of the installation, use painters tape to mark the stud location for brad nailing. Cut all planks in the
last row to the required width to complete the installation. Complete the installation as you have the earlier rows.
(Figure 8a)
15. Use quarter round for inside corners and ceiling. Finish with wall base board of your choice. (Figure 9)
8
8a
9
Quarter round
Wall base
Quarter round
Quarter round
Laminate Flooring on Wall Install Instructions
Care and Cleaning
Dry wipe as primary cleaning method. Occasionally damp wipe with water only. NO wet washing. If needed, use 1 cup of vinegar per gallon of
water OR 1/3 cup non-sudsing ammonia per gallon of water. DO NOT use detergents, abrasive cleaners, soaps, waxes or polishes. Wipe o spills
immediately. DO NOT allow moisture to remain on the product surface for longer than 30 minutes.
DO NOT attach objects such as pictures, shelves or television mounts directly to the laminate wall. DO NOT apply adhesive backed hooks or
install screws or nails into the laminate wall for hanging objects. Instead, drill clearance holes through the laminate and mount these objects
directly to wall studs with screws or nails. Drill the clearance holes through the laminate at least 1/2” larger than the diameter of the fastener that
will be used.
Precautionary Measures
Power tools should be equipped with a dust collector. If high dust level are encountered use an appropriate NIOSH designated dust mask. Avoid
dust contact with skin and eyes. First Aid Measures in case of irritations: In case of irritation flush eyes and skin with water for at least 15 minutes.