Installation Guide
WL Supplement
Pella® Garage Doors
WIND LOAD INS TAL L ATION INS TR UC T IONS
Wind Load Models
Page 2 of 2
©AGD 04.2014 FORM #878 PRINTED IN USA
Bottom Bracket
Jamb Bracket
Vertical Track
Roller Carrier
Top Fixture
Bolt Retainer Installation
Step 1:
Insert Roller into Roller Carrier (Figure A).
Step 2:
Hammer the 7/16“ Bolt Retainer onto the Roller Shaft, using a
9/16” socket or 9/16” Closed End Wrench (shown) and a
hammer (Figure A). Once the Bolt Retainer has been installed it
will be virtually impossible to remove without damaging the
retainer.
Note: Bolt Retainers will need to be installed on Rollers in both
Bottom Fixtures (Figure B), all Roller Carriers (Figure C) and
both Top Fixtures (Figure D) as well.
Step 3:
Repeat for each Roller as required
Additional Jamb Bracket Attachment (Figure E)
Continued from the Basic Instructions, Page 3, Step 11.
Step 1:
Starting with the slot at 10“ from the bottom of the vertical
of the track as shown in Figure F.
Step 2:
Attach the Jamb Bracket with (1) 1/4” x 5/8” Track Splice Bolt
and (1) 1/4”-20 Hex Nut. Hand tighten. Repeat this step
attaching the three other Jamb Brackets into the slots at 21”, 42”
& 63“ from the bottom of the track.
Note: Failure to install the Jamb Brackets in the correct slots
will result in your door not passing local inspection.
Note: This will allow for slight adjustments during the
installation.
Note: 1/4”-20 Hex Nuts always go on the outside of the track.
Continue with Step 12 of the Basic Instructions.
B
C
D
10”
21”
42”
63”
E
F
A
7/16” Bolt Retainer
Hex Nut to outside
of track
Right Side Assembly
Shown
to Middle of Slot
Right
Right Side Assembly
Track Splice Bolt