Instruction Manual
D. Luminaire Installation for Hard Surface Ceilings (F2)
Repeat the steps from D5 to D9 till the last transition
kit is assembled with the first luminaire in the surface
mount pattern. Complete the wire harness between
them using the connectors provided in the transitions
and luminaires.
Ensure that the wires does not get pinched between
surfaces while lifting. Fasten the knuckle set screws
to the surface mount brackets and make sure that the
knuckle set screws should be slightly tightened, so
that final fastening can happen in a quarter-turn to
half-turn of the set screws. TORQUE 4.2-5.8 in-lbs
10
90VC3S
(90 degree Vertical Corner 3
in Surface Mount)
90VCC3S
(90 degree Vertical Curved Corner 3 in
Surface Mount)
90FC4S
(90 degree Flat Corner 4 in
Surface Mount)
90FCC12S
(90 degree Flat Curved Corner
12 in Surface Mount)
90FC12S
(90 degree Flat Corner
12 in Surface Mount)
Transitions used in Surface Mount Patterns
© 2014 Acuity Brands Lighting, Inc. All Rights Reserved.. Products in this document may be covered by one or more U.S. Patents and Patents Pending. Specifications subject to change without
notice. Limited warranty applies. Complete warranty terms located at www.AcuityBrands.com/CustomerResources/Terms_and_Conditions.aspx
PEERLESS RENNA
9
09/26 ECO#074-293246
PIN007904 REV. E









