HydroStat User Guide
2
IMMERSION WELLS
REPLACING THE CONTROL
IMPORTANT Make sure that the immersion well or Electro-Well™ is installed in the boiler manufacturer’s designated
temperature limit control tapping.
NOTE:
If installing an Electro-Well, pipe sealing compound should be used. Teflon tape is not recommended.
NOTE: In the case of space restrictions, the HydroStat-IC control may be mounted in a vertical orientation without any loss of func-
tion. Hydrolevel recommends horizontal mounting, when possible, for proper orientation of LED display.
IMPORTANT: For proper operation of the low water cut-off function, there
must be a minimum of ½" clearance between the copper well tube and any
surface within the boiler.
See Electro-Well models on page 15.
NOTE: When installed on a standard immersion well, the “LWCO Active” LED
will not illuminate.
HydroStat-IC can be installed with an existing immersion well already in the boiler or with a Hydrolevel Electro-Well™
(sold separately). The low water cut-off function is automatically activated when installed with an Electro-Well™.
IMPORTANT: The control will not provide low water cut-off protection when installed with a standard immersion well.
NOTE: Do not use heat-conducting grease.
HydroStat-IC installed
with Hydrolevel Electro-Well™
HydroStat-IC installed
with standard immersion well
IMPORTANT – Sensor must be inserted all the way into the well for proper operation.
CORRECT INCORRECT
1 Turn off power to the system.
2 Unplug the line voltage connection, circulator connector, transformer connector, damper connector,
low voltage connector, and ignition wire from the existing control. See Figure 1 next page.
Note: When replacing a Honeywell control with Envirocom, disconnect the wires from the Envirocom
terminals and terminate safely. That feature will not be used with the new control.
3 Remove the old control from the boiler jacket and install the new control in the same mounting slots.
Note: To activate the low water cut-off feature of the new control, remove the existing immersion
well and replace it with a Hydrolevel Electro-Well.
4 Reconnect all plug connectors.
5 Insert the sensor fully into the well.
All work must be performed by a qualified and licensed professional in accordance with all
applicable codes and ordinances.










