Install Instructions

6
D. INSTALLATION SURVEY
For new and existing installations, a Water Installation
Survey is available from PB Heat, LLC. The survey will
provide information on how a hot water boiler works
with your specific system and will provide an overview
of hot water system operation in general.
You can also use this survey to locate system problems
which will have to be corrected. To obtain copies of the
Water Installation Survey, contact your PB Heat
representative or download it from PeerlessBoilers.com.
E. PLANNING THE LAYOUT
Prepare sketches and notes of the layout to minimize the
possibility of interferences with new or existing
equipment, piping, venting and wiring.
F. BOILER WATER TREATMENT
If the boiler water quality is outside the criteria shown
below, consult a qualified water treatment specialist to
bring the water quality within the criteria shown.
Water Quality Criteria:
1. Boiler water pH should be in 7.5 to 11 range.
2. Boiler water chloride concentration should be
less than 30 ppm.
PREINSTALLATION