USE & CARE GUIDE TABLE TOP WAVE DESIGN DECORATIVE FOUNTAIN W/ LED #PT-TF003
PARTS A 1x PART A B 1x PART B C 1bag D Stone 1x LED LIGHT TOOLS REQUIRED FOR ASSEMBLY • No tools required ASSEMBLY INSTRUCTION NOTE: The diagrams shown are for illustrative purposes only and are not to scale E 1x PUMP
ASSEMBLY INSTRUCTIONS 1. 2. 3. 4. 5. 6. 7. 8. Unpack the contents of the box and check to make sure that all items are accounted for and in good condition. Select a flat, level surface for the assembly and final location of your fountain. Position the part A over the part B. Connect the light power cable which is located under the part A and insert the pump outlet that is on the top of the pump into the water tube which is located under the part A.
WARNINGS: 1. 2. 3. Risk of electric shock. This pump is supplied with a grounding conductor and grounding-type attachment plug. To reduce the risk of electric shock, be certain that it is connected only to a properly grounded, grounding-type receptacle. To reduce the risk of electric shock, use only on portable self-contained fountains no larger than 5 ft / 1.52 m in any dimension. If equipped with a 3-prong, grounded type plug, do not remove the grounding pin from the plug on the power cord.
TROUBLESHOOTING GUIDE If the pump does not operate… 1. Check to make sure the pump is connected to a power source. 2. Check the water level to ensure the pump is completely submerged. Add water as needed. If the pump operates, but, there is no water flow… 1. Check the water level to ensure the pump is completely submerged. Add water as needed. 2. Check the supply tube for any kinks or folds and correct.
LIMITED WARRANTY This product is warranted to the user against missing parts, defective material and workmanship, under normal working conditions, for a period not to exceed the term noted on the chart below. This warranty period begins on the date of purchase by the original purchaser. Main body 30 days on construction, materials, paint and finish Pump 30 days This warranty covers only properly installed and maintained units.