User Manual
CAUTION!
For continued protection against fire or other hazard, replace only with fuse
of the specified voltage and current ratings.
Follow these steps to replace the fuse:
1. Turn ON/OFF button to turn the meter off and disconnect the test
probes.
2. Remove the back cover by unscrewing the 6 screws and
pulling off the back cover.
3. Remove the blown fuse.
4. Install the new fuse in the fuse compartment.
FF 500mA/600V; 5 x 20mm
F 10A/600V; 6,3 x 32mm
5. Replace the battery compartment and secure it with the
screws.
WARNING!
Do not operate your meter until the back cover is in place and fully closed.
All rights, also for translation, reprinting and copy of this manual or parts are
reserved.
Reproductions of all kinds (photocopy, microfilm or other) only by written
permission of the publisher.
This manual is according the latest technical knowing. Technical changings
which are in the interest of progress reserved.
© PeakTech
®
06/2012_1/Th.
PeakTech Prüf- und Messtechnik GmbH - Kornkamp 32 - DE-22926 Ahrensburg / Germany
+49-(0) 4102-42343/44 +49-(0) 4102-434 16
info@peaktech.de www.peaktech.de