Installation guide

Facto_
TOP VIEW OF BURNER AND MANIFOLD ASSEMBLY Ins
90 ° Elbow
2"(51 ram) Nipple
Street Elbow
L Gas Valve
Supply
Fig. 21 - Burner and Manifold
GAS
SUPPLY
MAN UAL
SHUTOFF
VALVE
(
SEDIMENT
TRAP
UNION
A08551
Fig. 22 - Typical Gas Pipe Arrangement
A02035
Piping should be pressure and leak tested in accordance with
NFGC, local, and national plumbing and gas codes before the
furnace has been connected. After all connections have been
made, purge lines and check for leakage at furnace prior to
operating furnace.
If pressure exceeds 0.5 psig (14-In. W.C.), gas supply pipe nmst
be disconnected from furnace and capped before and during
supply pipe pressure test. If test pressure is equal to or less than
0.5 psig (14-In. W.C.), turn off electric shutoff switch located on
furnace gas control valve and accessible manual equipment
shutoff valve before and during supply pipe pressure test. After
all connections have been made, purge lines and check for
leakage at furnace prior to operating furnace.
The gas supply pressure shall be within the maximum and
minimum inlet supply pressures marked on the rating plate with
the furnace burners ON and OFF.
Fig. 23 - Relocating J-Box
A10291
O
A10141
Fig. 24 - Field-Supplied Electrical Box on Furnace Casing
ELECTRICAL CONNECTIONS
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal
injury or death.
Blower access panel door switch opens l15-v power to
control. No component operation can occur. Do not bypass
or close switch with panel removed.
See Fig. 26 for field wiring diagram showing typical field l15-v
wiring. Check all factory and field electrical connections for
tightness.
20