Installation Instructions
ASSEMBLY INSTRUCTIONS
Ceiling Canopy
STEP 6:
a. Cut wires 6" beyond canopy
Wire Strippers
6”
6
STEP 5:
a. Pass the Supply Wires and Ground Wires through
the Ceiling Canopy, Flat Washer, Lanyard, Spring
Washer and Hex Nut.
b. Pass the Ceiling Canopy, Flat Washers, Lanyard,
and Spring Washers over Nipples as shown in the
diagram. Secure them with Hex Nuts and hand-
tighten until snug.
Spring Washers
Hex Nut
Flat Washer
Ceiling
Canopy
Nipple
E
Lanyard
STEP 7:
a. The lanyard is provided as a means to support
the fixture from the junction box while connecting
the electrical wires. This enables the fixture to
hang from the junction box and your hands are
free to make the wire connections.
b. Turn the button stop so it may be inserted into the
crossbar slot. Make sure the button stop is
completely inside the crossbar.
c. Slowly release the fixture to make sure it is
supported by the button stop.
d. Once wiring is complete, the lanyard will push
into the junction box when the ceiling canopy is
attached to the ceiling.
Proceed to Step 8
Crossbar Assembly
Button Stop
Lanyard
Slot
STEP 4:
a. Determine the Rods to be assembled according
to your desired hanging height.
b Pass the Supply Wires through the chosen Rods
and then thread Rods to
together as shown. Tighten until snug.
Assemble one rod at a time.
- Pass the ground wire through the rod first.
- Then, pass the supply wire through the rod.
- Thread the rod by hand until snug.
.
Socket Assembly (F)
-
c. Screw Swivels (E) into the top end of the Upper
Rod. Please be sure the open end of the Swivels
(E) are the same directions before tightening
them until snug.
Suggested rod length to hang fixture 30 inches
above table top:
-8 ft ceiling will use (4) rods 12".
-9 ft ceiling will use (6) rods 12".
-10 ft ceiling will use (6) rods 12" and (4) rods 6".
: If mounting over an Island, subtract 6
inches from the rod lengths listed above.
Note
A
A
B
E
C
B
F