Installation Instructions
ASSEMBLY INSTRUCTIONS
4
STEP 6:
a. Re-attach the ceiling canopy to the Crossbar
Assembly (AA).
b. Then, attach the lock ball over the ceiling canopy.
lock ball
STEP 9:
a. Install correct bulbs referring to fixture markings and/or labels for maximum wattage.
Your installation is now complete. Restore electricity. Retain this sheet for future reference.
STEP 8:
a. Carefully hold the Shade (H) and the Shade
Holder adjust them to your desired directions.
,
Swivel
STEP 7:
a. Remove the socket collar (D) from the socket
on the Socket Assembly (F).
Then Place the shade (H) over the socket on
the Socket Assembly (F).
Using socket collar tool (G), thread socket
collar (D) onto socket and hand-tighten until
snug to secure shade (H).
H
F
H
D
G
WHITE
BLACK (OR RED) WIRE
WHITE
BLACK
FROM SUPPLY
FROM SUPPLY
FROM FIXTURE
FROM FIXTURE
STEP 5:
* Use Wire Connectors (supplied) to connect the
wires.
a) Ground Wire:
1. Wrap supply around
on mounting bracket, no less than 2
inches. from the end of the wire. Tighten
.
2. Connect fixture to
wire with wire connector.
b) Supply Wire:
1. Connect the to the
with wire connector.
2. Connect the wire to the
with wire connector.
3. Wrap each connection with approved electrical
tape and carefully stuff all of the connected wires
into the outlet box.
ground wire green ground
screw
ground
screw
ground wire supply ground
supply white wire white
fixture supply wire
supply black (or red)
black fixture supply wire
GROUND WIRE
GROUND WIRE
FROM SUPPLY
FROM FIXTURE
GREEN GROUND SCREW
AA