Cut Sheet

By installing the RF Receptacle into a building’s branch wiring system
and tying the low-voltage RF Signal Pack into an occupancy sensor and
24VDC power pack, you can control both lighting and receptacle usage.
Control multiple dual- and half-controlled receptacles on the
same circuit with feed-thru capability of the RF receptacle.
One Signal Pack
allows you to control
multiple RF receptacles
Lighting Load
Occupancy Sensor
CONTROL THAT’S CONVENIENT, CONNECTED
AND CODE-COMPLIANT.
New requirements for reducing energy consumption in commercial
buildings are here. Standards such as CA Title 24 - 2013 and ASHRAE
90.1 - 2010, 2013 now require that at least 50 percent of all receptacles in
designated spaces of a building becontrollable automatically turning
themselves off and on as needed. Legrand is making it easy for installers
to stay code-compliant with a full line of Plug Load controllable
solutions. Devices that are so easy to understand, install and use, they
take a load off your mind and a load off your customers’ electric bills.