User's Manual

®
Cast Beam Structures Set ME-7009
5
After Drying, Remove the Mold
Let the mixture dry in the mold for 24 hours.
After the concrete dries, relieve the tension on the beam and then
remove the cast beam member from the tension fixture.
Carefully remove the mold from the cast beam. (The mold can be
cleaned and used again.)
Assemble a Test Fixture
A successful test fixture provides three things:
Support for the cast beam member.
Ways to apply a load to the cast beam member.
Ways to measure the effect of the load on the cast beam member.
Single Point Test Fixture
The example test fixture shown here provides a way for a load of sev-
eral kilograms to be applied to the middle of the cast beam member
while the dial indicator of the PS-2204 Displacement Sensor measures
the beam’s deflection. The image below shows the details of how the
dial indicator is used
Cast Beam member with
sand/plaster mixture
#4
#4
Cast
Beam
Full
Round
Half
Round
Sliding
Connector
#5
#3
Cord
Clip
#4
#3
#4
Support
Rod
#3
Large
Slotted
Masses
Cast
Beam
Dial
Indicator
Cable to
Displacement
Sensor
#4
#3
Flat
Round