User's Manual
®
Cast Beam Structures Set ME-7009
5
After Drying, Remove the Mold
• Let the mixture dry in the mold for 24 hours.
• After the concrete dries, relieve the tension on the beam and then
remove the cast beam member from the tension fixture.
• Carefully remove the mold from the cast beam. (The mold can be
cleaned and used again.)
Assemble a Test Fixture
A successful test fixture provides three things:
• Support for the cast beam member.
• Ways to apply a load to the cast beam member.
• Ways to measure the effect of the load on the cast beam member.
Single Point Test Fixture
The example test fixture shown here provides a way for a load of sev-
eral kilograms to be applied to the middle of the cast beam member
while the dial indicator of the PS-2204 Displacement Sensor measures
the beam’s deflection. The image below shows the details of how the
dial indicator is used
Cast Beam member with
sand/plaster mixture
#4
#4
Cast
Beam
Full
Round
Half
Round
Sliding
Connector
#5
#3
Cord
Clip
#4
#3
#4
Support
Rod
#3
Large
Slotted
Masses
Cast
Beam
Dial
Indicator
Cable to
Displacement
Sensor
#4
#3
Flat
Round










