Manual

- 5 -
ETLM Installation
Back of 2083E
Primar
y
Tem
p
erature Mete
r
Wiring Installation in 4838 Reactor Controller
7. Locate the 2083E Primary Temperature
Meter. There is a red wire connected
between pin 2 and the 1119E solid state
relay (position 3). Remove the tabbed end
of this wire from the 1119E and attach it to
the 2082E ETLM meter on pin 9.
8. Locate the free yellow wire #5 from the kit
and attach one end to pin 10 on the 2082E
meter. The other end attaches to the
1119E solid state relay (position 3).
Pin Outs:
2082E Color: Attaches to:
Pin 1 Black Terminal Block 4
Pin 2 White Terminal Block 3
Pin 3
Pin 4 White T/C jack +
Pin 5
Pin 6 Red T/C jack -
Pin 7 Blue Terminal Block 3
Pin 8 Orange 2083E Primary Temp Meter #14
Pin 9 Red 2083E Primary Temp Meter #2
Pin 10 Yellow 1119E SSR (3)
Pin 11 White 2083E Primary Temp Meter #10
Pin 12 Black 2083E Primary Temp Meter #9
Final Steps:
Close the controller and replace the two screws on the top plate. Plug the 4838
controller back in, and turn it on.
It is useful to check that the settings on the display are set correctly. Check these
against the defaults listed in the back of these instructions.
SSR position 3