Router User's Guide
Table Of Contents
- Contents
- About This Guide
- 1. About the FrameSaver SLV
- 2. User Interface and Basic Operation
- 3. Configuration Procedures
- 4. Configuration Options
- Using the Easy Install Feature
- Using RIP with FrameSaver SLV CSU/DSUs
- Entering System Information and Setting the System Clock
- Setting Up the Modem
- Setting Up Auto-Configuration
- Setting Up Dial Backup
- PVC Backup Over the Network Interface
- Setting Up Back-to-Back Operation
- Configuration Option Tables
- Configuring the Overall System
- Configuring Physical Interfaces
- Assigning Time Slots/Cross Connections
- Configuring Frame Relay for an Interface
- Manually Configuring DLCI Records
- Configuring PVC Connections
- Configuring the IP Path List
- Setting Up Management and Communication Options
- Configuring the Criteria for Automatic Backup
- 5. Configuring the FrameSaver SLV Router
- FrameSaver SLV Router Overview
- IP Routing
- Address Resolution Protocol
- Proxy ARP
- Interface Configuration
- Network Address Translation
- Network Address Port Translation
- Dynamic Host Configuration Protocol Server
- DHCP Relay Agent
- Router Security
- Provisioning the Router Interface
- Configuring the Router Using Terminal Emulation
- 6. Security and Logins
- 7. Operation and Maintenance
- 8. Troubleshooting
- 9. Setting Up OpenLane for FrameSaver Devices and Activating SLM Features
- 10. Setting Up NetScout Manager Plus for FrameSaver Devices
- 11. Setting Up Network Health for FrameSaver Devices
- A. Menu Hierarchy
- B. SNMP MIBs and Traps, and RMON Alarm Defaults
- C. Router CLI Commands, Codes, and Designations
- D. Router Command Line Summaries and Shortcuts
- E. Connectors, Cables, and Pin Assignments
- F. Technical Specifications
- G. Equipment List
- Index

8. Troubleshooting
9128-A2-GB20-80 September 2002
8-19
Test Timeout Feature
A Test Timeout feature is available to automatically terminate a test (as opposed to
manually terminating a test) after it has been running a specified period of time.
It is recommended that this feature be used when the
FrameSaver unit is remotely
managed through an inband data stream (PVC). If a test is accidently commanded
to execute on the interface providing management access, control is regained
when the specified time period expires, automatically terminating the test.
To use this feature, enable the Test Timeout configuration option, and set a
duration for the test to run in the Test Duration (min) configuration option (see
Configuring General System Options
in Chapter 4,
Configuration Options
).
NOTE:
These configuration options do not pertain to tests commanded by the DTE,
like a DTE-initiated External Loopback.
DBM Tests
The Test menu allows you to run PVC loopbacks and test patterns on the unit and
its DBM interface. It is available to users with a security access level of 1 or 2.
Currently, there are no physical tests for a BRI DBM interface.
DBM tests are started and monitored the same as the network tests. See
System
and Test Status Messages
in Chapter 7,
Operation and Maintenance
, for ISDN
backup-related test messages appearing on the System and Test Status screen.
See
PVC Tests
on page 8-22 on for additional information.










