Installation Manual

PE Smart Gateway Neptune US
Installation manual
Document No. [DOC-INS-0059-02] Date of last revision [23.11.2018]
Page 5 / 30
A power supply cord with a minimum conductor section 0.75 mm
2
(AWG-18) suitable for outdoor use and
compliant with relevant local and national regulations shall be used
In the final installation, an external 20 A magneto-thermal switch must be installed as means of short-
circuit backup protection
It is recommended to apply an adequate splicing tape in the final outdoor installation as specified at par.
4.3.3.1. Paradox Engineering recommends the use of the following tape: Scotch® Linerless Rubber Splicing
Tape 130C, 3M
Depending on final installation, the use of RF extension cord for the antenna mounting shall be performed
as specified at par. 4.3.3.2
Dispose of packaging or product must be in compliance with applicable local and national waste disposal
regulation
Keep this document for future use and reference