Submittal
PANDUIT – FOR PUBLIC USE | January 15, 2020 | P: 800-777-3300 | Page 9
Split Bolt Connectors
Typical Installation
Considerations
• Sensor leads must be secured to the
power conductor
• Connections must be insulated
• AVT sensor leads must have ferrules
applied at all termination points
SCCR Impact
No Impact
Limitations
• If extending the sensor leads, the
total length of the sensor leads plus
the sensor lead extensions must be
less than 10ft from the isolation
module to the connection point on
the power conductor (to comply with
NEC tap rule)