Specifications

5
visit www.panduit.com/Cabinets
Increase Density to Optimize Data Center Capacity
Panduit Net-Access
PDUs, integrated into thermally optimized Net-Access
Cabinets, enable data center managers to realize higher capacity utilization and
reduced OpEx and CapEx costs.
Typical cabinets are loaded to 5 to 7kW on average, which is often far less than the physical space available within the cabinet resulting in overprovisioning or
the need to build expensive new whitespace.
Gartner estimates that data center  oor
space costs $4,900 per cabinet annually
in CapEx and OpEx (excluding power
and cooling) regardless of
capacity utilization.*
Increasing the density of a 100kW data center can reduce
oor space costs from $98,000 to $34,300 and yield up to
$63,700 in annual savings versus competitive offerings.
Impact of Increasing Density
$4,900 per Cabinet Space
5-7kW
15kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
5
kW
15
kW
15
kW
15
kW
15
kW
15
kW
15
kW
15
kW
100 kW
$98,000
Typical Density
100 kW
$34,300
High Density