Specifications

visit www.panduit.com
6
Space
between
individual
fingers
organize up
to 48 Category
6A cables
Deep vertical
managers
provide space
to manage
high densities
Cable Management
Equipment management is part
of the foundation of the Unified
Physical Infrastructure
SM
(UPI)
approach, providing full structure
protection of equipment, delivering
UL rated support, and respecting
equipment airflow patterns. Vertical
cable management that not only
provides slacking of patch cords,
but goes beyond in the ability to
support options to simplify system
organization and interface to the
system-wide infrastructure.
FiberRunner
®
and Wyr-Grid
®
Overhead
Routing Systems (depicted at top left
and right) route, manage, and protect
cables throughout the data center*.
High Density Solutions for the Cisco
^
Nexus 7009 Switch
Effectively deploying the latest high performance network switches requires in-depth knowledge of cable management,
infrastructure, thermal management, and the ability to apply that knowledge in the creation of superior solutions.
Vertically
oriented strain
relief bars
effectively
manage
structured
cabling in the
rear of the rack
and provide
separation of
cable types
Flexible
power outlet
unit mounting
for any
equipment
power
requirements
Infrastructure
Open areas
respect
equipment
airflow
patterns
Front to back
spaces can be
closed off for
hot/cold aisle
applications
Thermal Management
*Download the Wyr-Grid
®
Overhead Cable Tray Routing System brochure (SA-RKCB18) and FiberRunner
®
Application Guide (SA-FRCB02) at www.panduit.com.
SA-RKCB15 (Space Saving CableMgmt Brochure).qxp 2/13/2012 2:55 PM Page 6